The existing storm water drainage system in the northwest sector of the city of Medicine Hat, Alberta was over capacity and could not meet the demands of the continual commercial and industrial growth in the area. The City of Medicine Hat imposed development restrictions in the sector until a solution could be found to relieve the capacity issues. Furthermore, the high traffic intersection of Box Springs Road & Saamis Drive NW would flood frequently during rain events and would often require closure for public safety.
In 2016, the City of Medicine Hat decided to proceed with the Northwest Storm Trunk project to install a new storm water trunk main to address the issues. The Northwest Storm Trunk will convey storm water discharged from several existing and proposed Storm Water Management Facilities to an outfall, discharging to the South Saskatchewan River.
RELATED: Concrete pipe replaces two-year-old storm sewer
The City of Medicine Hat engaged MPE Engineering Ltd. (MPE) through a request for proposal process to provide storm water modeling, preliminary design, detailed design, tender documents, contract administration, site inspections, and quality assurance testing for the project.
The Northwest Storm Trunk alignment closely followed a proposed alignment for a sanitary sewer trunk main that was also being planned for the northwest sector. The designs of both trunk mains were completed simultaneously by MPE and combined into one construction tender.
RELATED: Major Mackenzie Drive culvert replacement project
Generally, the project included the design of a storm water and sanitary sewer trunk main, railway crossings, pipeline crossings, river outfall upgrades, energy dissipation structures, roadway design, and a storm water dry pond.
The design was completed, and the project wastendered for construction in March 2018. The construction contract was awarded to BYZ Enterprises Inc., of Medicine Hat. Construction began in June 2018 and is expected to be complete in October 2019.
Technical scope for Northwest Storm Trunk included the following concrete pipes:
Flexible pipe systems and rigid pipe systems were reviewed during the design process for the Northwest Storm Trunk. Upon analysis of the project conditions, both MPE and the City of Medicine Hat concluded that flexible pipe systems were not suitable for the Northwest Storm Trunk; as such only rigid RCP was specified.
The decision to use RCP was based on the following project challenges:

Backfiling-and-compacting-around-reinforced-concrete-storm-pipe
The flexible pipe design for sections of this project would require specifying Class I material compacted to 95 percent. Although it is possible to design an embedment material and compaction effort to support a flexible pipe installation, it was our opinion that it is not practical to assume a contractor will consistently achieve greater than 95 percent compaction within the pipe embedment zone especially with large diameter pipe, at significant depths, while facing groundwater infiltration and loose soils.
The inherent strength of RCP compensates for any construction shortcomings dealing with trench depths and trench conditions rather than relying on the pipe embedment for strength. Specifying RCP carried less risk in the installation for this project. RCP allowed for a more consistent installation as it is less structurally dependent on bedding and haunching which would have been very challenging to install adequately to support other pipe materials in the wet trench conditions.
Also, the shorter pipe lengths of RCP allowed for easier install in deep, wet, loose native trench conditions versus a 6m long section of flexible pipe.
Furthermore, at the depths and conditions expected, there was negligible expected cost savings specifying flexible pipe systems over RCP. With at least three RCP manufacturers in Alberta alone, competitive pricing was seen in the tender and the project is coming in on-budget.
Other project challenges included:
Steep Grades
Long Segments of the Northwest Storm Trunk have grade in excess of 6 percent. The potential for pipe abrasion was reviewed with RCP pipe manufacturers. Energy dissipation structures were designed to reduce the energy grade line of the Northwest Storm Trunk and manhole structures required reinforcement to prevent scouring.
Access to properties
The Northwest Storm Trunk alignment is located within existing roads and installation required road closures. To maintain access to residences and businesses along the route the project had to be phased around important intersections. Temporary roads were constructed parallel to the workspace to maintain through traffic. Effected property owners were engaged during the design phase to discuss access requirements and review options. By engaging the effected property owners during design and having them provide input on the temporary access design, it reduced the frustration of the property owners during construction.
RCP was critical to overcoming many of the project challenges and will provide the City of Medicine Hat with a reliable storm water trunk for many years.
Construction 2018 to 2019
Client: City of Medicine Hat, Municipal Works Department
Consultant: MPE Engineering Ltd.
General Contractor: BYZ Enterprises Ltd.
Reinforced Concrete Pipe Manufacturer: Precon
By: Greg Christensen, P.Eng. Project Manager, MPE Engineering Ltd.
Peel Regional Council heard nine delegations on July 5, 2012 concerning the Hanlan Water Project. ...
A sanitary sewer project was released for tender by the City of London in early ...
The CCPPA has completed an update of its design standards for precast concrete maintenance hole ...